Wednesday, 5 May 2010

time plan

BA (Hons) Costume with Performance Design 2009-2010

Level: 5

Unit Title: Self Directed Project

Date

Day

Start Time

Finish Time

Session

15/03/10

Mon



Off campus

16/03/10

Tues

9.30

4.30

Studio – library collect research

17/03/10

Wed

9.30

4.30

Studio – draw up basic blocks

18/03/10

Thurs

9.30

4.30

Studio – draft blocks

19/03/10

Fri



Off campus






22/03/10

Mon

9.30

4.30

Studio – cut out fabric, create toile

23/03/10

Tues

9.30

4.30

Studio – continue toile construction, first fitting

24/03/10

Wed

9.30

4.30

Studio – make alterations after fitting

25/03/10

Thurs

1.30

4.30

Studio – re draw patterns and be ready for after Easter

26/03/10

Fri



Off campus

Easter Holiday

26/03/10-12/04/10

Easter Holiday

Easter Holiday

Easter Holiday

Easter Holiday

Work Placement

12/04/10-30/04/10

Work Placement

Work Placement

Work Placement

Work Placement

3/05/10

Mon

May Bank holiday

May Bank holiday

May Bank holiday

4/05/10

Tues

9.30

4.30

Studio – cut out patterns on top fabric

5/05/10

Wed

9.30

4.30

Studio – mark stitch and apply Mac graduate, begin costume construction

6/05/10

Thurs

9.30

4.30

Studio – costume construction (pockets)

7/05/10

Fri

9.30

4.30

Studio – costume construction (pockets)






10/05/10

Mon

9.30

4.30

Studio – costume construction (lining)

11/05/10

Tues

9.30

4.30

Studio – costume construction (lining)

12/05/10

Wed

9.30

4.30

Studio – costume construction (lining)

13/05/10

Thurs

9.30

4.30

Studio – finishing costume

14/05/10

Fri

9.30

4.30

Studio – finishing costume






17/05/10

Mon

9.30 – 10.00


Hand in

No comments:

Post a Comment